Please add "Robin_Connelly@mail.vresp.com" to your Address Book and Safe Lists.
Please click here if your email program has trouble displaying this email.
Pinchin Environmental Ltd - New MOE Policy - Non-Emergency Generators
   PEN 32 New MOE Policy Proposal
February 2008    
 

New MOE Policy Proposal for Emission Limits for

INTERNAL COMBUSTION ENGINES

used for Non-Emergency Power Generation


The MOE is seeking pubic input on implementation options!!

http://www.pinchin.com/air/news/new-moe-policy-proposal


The Ontario Ministry of the Environment (MOE) has posted for comment a Policy Proposal Notice that provides emission limits for power generator sets that are used in non-emergency situations such as for peak shaving or in the Ontario Power Authorities (OPA) Demand Response (DR) Program. The limits will apply to internal combustion engines running on diesel, bio-diesel, natural gas, or dual fuel (natural gas/diesel) systems.

The Proposed limits will apply to:

  • Owner/operators participating directly or through an aggregator in OPA's Demand Response III program or similar program

  • Facilities that reduce their dependency on the grid or supply the grid during periods of high electricity system demand

  • Facilities that generate on-site power to meet all, or a portion, of their demands.

  • The proposed limits will not apply to stand-by or emergency power.


According to the MOE, the purpose of the emission limits is to ensure that emissions from new power sources that will replace or offset some of Ontario’s coal-fired generation capacity will be as clean as, or cleaner, than emissions generated from natural gas combustion turbines.

To view the proposed in-stack limits, please follow this link:

http://www.pinchin.com/air/news/new-moe-policy-proposal#limit


Emergency Load Reduction Program:

Participants in the ELRP program will not be required to meet the limits stated above but will be required to meet the ELRP limits and the standards of O. Reg. 419. For ELRP and O.Reg 419 standards, please follow this link.

http://www.pinchin.com/air/news/new-moe-policy-proposal#load


Authors' Comments:

The proposed emission limits could be challenging. To read Philip Girard's, Vice-President Pinchin Environmental, comments and what was learned from an on-line search of several equipment suppliers, please follow this link:

http://www.pinchin.com/air/news/new-moe-policy-proposal#author


Air & Noise Services

The Air Emissions Group of Pinchin Environmental provides engineered solutions to companies faced with the challenge of minimizing the impact of their operations on workplace and atmospheric air quality. In general terms, the group provides a package of services that lead clients through customized ventilation and emission control projects, from plant or process review, through to implementation.


Pinchin Environmental Ltd., as part of the Pinchin Group of Companies, is one of Canada's largest environmental, health and safety consulting firms. Widely known for our efficiency when completing even the most challenging projects, our clients have also come to appreciate our unwavering commitment to project delivery, technical competence and honesty in our business dealings.

Engineering, Consulting, Project Management and Training in:
 

 

Head Office:
Pinchin Environmental Ltd.
2470 Milltower Crt.
Mississauga ON  L5N 7W5

Phone:  905-363-0678
Toll Free:  1-888-767-3330
Fax: 905-363-0681
Email:  info@pinchin.com


please consider the environment before printing this e-mail.

Call 888.767.3330---Pinchin Environmental and take the first step
to preparing your corporate carbon footprint.


© Pinchin Environmental Ltd. All rights reserved.     www.pinchin.com

Please click here if your email program has trouble displaying this email.